No photo of Fletcher Griffis

Fletcher Griffis

Full Professor

    1966 …2017

    Research output per year

    If you made any changes in Pure these will be visible here soon.

    Research Output

    2017

    Local wind model in New York City

    Azimi, E. & Griffis, F. H., Jan 1 2017, 6th CSCE-CRC International Construction Specialty Conference 2017 - Held as Part of the Canadian Society for Civil Engineering Annual Conference and General Meeting 2017. Canadian Society for Civil Engineering, p. 997-1006 10 p. (6th CSCE-CRC International Construction Specialty Conference 2017 - Held as Part of the Canadian Society for Civil Engineering Annual Conference and General Meeting 2017; vol. 2).

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    Mapping potential of wind energy in New York City

    Samaneh, G. & Griffis, F. H., Jan 1 2017, Canadian Society for Civil Engineering Annual Conference and General Meeting 2017: Leadership in Sustainable Infrastructure. Canadian Society for Civil Engineering, p. 358-362 5 p. (Proceedings, Annual Conference - Canadian Society for Civil Engineering; vol. 2017-May).

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    2016

    Evaluation of New York State's County Plans for Disaster Resiliency

    Azimi, E., Gholitabar, S. & Griffis, F. H., Jan 1 2016, Construction Research Congress 2016: Old and New Construction Technologies Converge in Historic San Juan - Proceedings of the 2016 Construction Research Congress, CRC 2016. Perdomo-Rivera, J. L., Lopez del Puerto, C., Gonzalez-Quevedo, A., Maldonado-Fortunet, F. & Molina-Bas, O. I. (eds.). American Society of Civil Engineers (ASCE), p. 1528-1537 10 p. (Construction Research Congress 2016: Old and New Construction Technologies Converge in Historic San Juan - Proceedings of the 2016 Construction Research Congress, CRC 2016).

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    Risk Analysis of Bridges to Prioritize Post-Storm Scour Mitigation Plans

    Gholitabar, S., Azimi, E. & Griffis, F. H., Jan 1 2016, Construction Research Congress 2016: Old and New Construction Technologies Converge in Historic San Juan - Proceedings of the 2016 Construction Research Congress, CRC 2016. Perdomo-Rivera, J. L., Lopez del Puerto, C., Gonzalez-Quevedo, A., Maldonado-Fortunet, F. & Molina-Bas, O. I. (eds.). American Society of Civil Engineers (ASCE), p. 1619-1627 9 p. (Construction Research Congress 2016: Old and New Construction Technologies Converge in Historic San Juan - Proceedings of the 2016 Construction Research Congress, CRC 2016).

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    2014

    Productividad Automatizada Basada en el Itinerario Animado (APBSA): Una Simulacion Basada en un Enfoque del Analisis de Compensacion Tiempo-Costo

    Translated title of the contribution: Automated productivity-based schedule animation: Simulation-based approach to time-cost trade-off analysisGelisen, G. & Griffis, F. H., Apr 1 2014, In : Journal of Construction Engineering and Management. 140, 4, B4013007.

    Research output: Contribution to journalArticle

    2013

    A framework for an automated and integrated project scheduling and management system

    Chen, S. M., Griffis, F. H., Chen, P. H. & Chang, L. M., May 8 2013, In : Automation in Construction. 35, p. 89-110 22 p.

    Research output: Contribution to journalArticle

    Compensation structure and contingency allocation in integrated project delivery

    Liu, M., Griffis, F. H. & Bates, A. J., Sep 24 2013.

    Research output: Contribution to conferencePaper

    Connecting technology, industry and research: A vertical integrated project course for BIM education

    Liu, M., Griffis, F. & Bates, A., 2013, Fifth International Conference on Construction Engineering and Project Management (ICCEPM-2013).

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    Design of public projects: Outsource or in-house?

    Griffis, F. H. & Choi, H., Jan 1 2013, In : Journal of Management in Engineering. 29, 1, p. 2-9 8 p.

    Research output: Contribution to journalArticle

    2012

    Project specific, driven based contingency estimating model in construction

    Liu, M., Griffis, F. & Bates, A., 2012, In : Journal of Management in Engineering.

    Research output: Contribution to journalArticle

    Simulation and analytical techniques for construction resource planning and scheduling

    Chen, S. M., Griffis, F. H., Chen, P. H. & Chang, L. M., Jan 1 2012, In : Automation in Construction. 21, 1, p. 99-113 15 p.

    Research output: Contribution to journalArticle

    2011

    Maglev 2000 System Grand Central Terminal to Stewart International Airport

    Griffis, F., Powell, J., Danby, G. & Jordan, J., 2011, Maglev 2011, Daejong, South Korea. October 2011.

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    Power storage using Maglev 2000

    Powell, J., Griffis, F. & Danby, G., 2011, Maglev 2011, Daejong, South Korea. October 2011.

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    The Maglev Network

    Powell, J., Griffis, F., Danby, G. & Jordan, J., 2011, Maglev 2011, Daejong, South Korea. October 2011.

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    2010

    Automated Productivity Based Schedule Automation (APBSA) case study: Systems Engineering Facility III, Hanscom AFB, MA

    Griffis, F. & Gelisen, G., 2010, 2010 ASCE Construction Congress, Banff, Canada, May 2010.

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    2009

    Adaptation of the LIRR system to Maglev for faster, more convenient and lower cost service

    Powell, J., Griffis, F., Danby, G., Fazio, E. & Jordan, J., 2009, 2nd Advanced Energy Conference, Stony Brook, Long Island, NY, Nov. 18-19, 2009.

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    Building information model: The role and need of the constructors

    Aslani, P., Griffis, F. H. & Chiarelli, L., Sep 11 2009, Building a Sustainable Future - Proceedings of the 2009 Construction Research Congress. p. 467-476 10 p. (Building a Sustainable Future - Proceedings of the 2009 Construction Research Congress).

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    How Maglev can enable Stewart Airport to become the 4th major airport for the NYC region

    Griffis, F., Powell, J., Danby, G., Jordan, J. & Fazio, E., 2009, 2nd Advanced Energy Conference, Stony Brook, Long Island, NY, Nov. 18-19, 2009.

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    2008

    Critical need of New York City infrastructure

    Griffis, F., 2008, National Infrastructure Conference, Iona College, February 19, 2008.

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    Future developments in New York infrastructure

    Griffis, F., 2008, Proceedings, Annual Infrastructure Conference, ASCE, March 31, 2008.

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    How to use BIM in construction

    Griffis, F., 2008, American Council of Engineering Companies, Las Vegas, Nevada, February 8, 2008.

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    Structural engineering aspects of Maglev second generation technology

    Griffis, F., 2008, Proceedings, Structural Engineering Technical Conference, ASCE, May 15, 2008.

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    2007

    Building information model in the management of construction

    Griffis, F., 2007, American Society of Civil Engineers, Met Section Structures Group, December 2007.

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    Construction challenges associated with Maglev guideways

    Griffis, F., 2007, Proceedings, ASCE Construction Congress, May 2007.

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    Construction challenges associated with Maglev research

    Griffis, F., 2007, Proceedings of the Annual Construction Congress, American Society of Civil Engineers.

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    Engineering failures exposed by Hurricane Katrina

    Griffis, F. H. B., Apr 1 2007, In : Technology in Society. 29, 2, p. 189-195 7 p.

    Research output: Contribution to journalArticle

    Maglev technology, theory and practice

    Griffis, F., 2007, Emeritus professors in Columbia, October 2007.

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    2006

    The owners role in project success

    Griffis, F. & Bates, A., 2006, Proceedings of the Construction Industry Institute Annual Conference, Dallas, Texas, August 2006.

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    2005

    Addressing pricing: Value bidding for engineers and consultants

    Sturts, C. S. & Griffis, F. H., Jun 1 2005, In : Journal of Construction Engineering and Management. 131, 6, p. 621-630 10 p.

    Research output: Contribution to journalArticle

    Pricing engineering services

    Sturts, C. S. & Griffis, F. H., Apr 1 2005, In : Journal of Management in Engineering. 21, 2, p. 56-62 7 p.

    Research output: Contribution to journalArticle

    The owners role in project success

    Griffis, F., 2005, Construction Industry Institute. (Technical Report RT152)

    Research output: Book/ReportOther report

    2004

    Qualifications-based selection of professional A/E services

    Christodoulou, S., Griffis, F. H., Barrett, L. & Okungbowa, M., Apr 1 2004, In : Journal of Management in Engineering. 20, 2, p. 34-41 8 p.

    Research output: Contribution to journalReview article

    Fully integrated and automated project process (FIAPP) for the project manager and executive

    Griffis, F. & Sturts, C., 2003, 4D CAD and visualization in construction: Developments and applications. Exton, PA: A.A. Balkema Publishers, Chapter 3

    Research output: Chapter in Book/Report/Conference proceedingChapter (peer-reviewed)

    Fully integrated and automated project processes (FIAPP) in building construction and renovation - A brick at a time

    Subsomboon, K., Christodoulou, S. & Griffis, F. H., Dec 1 2003, Building Integration Solutions: Proceedings of the Architectural Engineering 2003 Conference. Lui, M., Lui, M. & Parfitt, K. M. (eds.). p. 204-208 5 p. (Architectural Engineering, Building Integration Solutions).

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    In pursuit of catalysts for new technology - A case for qualifications-based selection (QBS) of professional A/E services

    Christodoulou, S., Griffis, F. H., Barrett, L. P. & Okungbowa, M., Dec 1 2003, Building Integration Solutions: Proceedings of the Architectural Engineering 2003 Conference. Lui, M., Lui, M. & Parfitt, K. M. (eds.). p. 196-199 4 p. (Architectural Engineering, Building Integration Solutions).

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    Leadership in the Management of Construction

    Griffis, F. H. & Brown, N., Dec 1 2003, Construction Research Cogress, Winds of Change: Integration and Innovation in Construction, Proceedings of the Congress. Molenaar, K. R. & Chinowsky, P. S. (eds.). p. 559-568 10 p. (Contruction Research Congress, Winds of Change: Integration and Innovation in Construction, Proceedings of the Congress).

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    Procurement of Services and Materials Using a FIAPP-Based System - New York City Case Studies

    Subsomboon, K., Christodoulou, S. & Griffis, F. H., Dec 1 2003, Construction Research Cogress, Winds of Change: Integration and Innovation in Construction, Proceedings of the Congress. Molenaar, K. R. & Chinowsky, P. S. (eds.). p. 1039-1047 9 p. (Contruction Research Congress, Winds of Change: Integration and Innovation in Construction, Proceedings of the Congress).

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    2001

    Four-dimensional computer models and simulation for the support of the Fully Integrated and Automated Project Process (FIAPP)

    Shih-Ming, C., Christodoulou, S. & Griffis, F., 2001, Specialty Conference on Fully Integrated and Automated Project Processes, VPI, September 2001.

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    Improving the construction project process by a Collaborative Construction Information System (CCIS) -An approach to integrating construction systems in FIAPP

    Griffis, F., Christodoulou, S. & Hsiao-Hua, C. E., 2001, Specialty Conference on Fully Integrated and Automated Project Processes, VPI, September 2001.

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    2000

    Construction planning for engineers

    Griffis, F. & Farr, J., 2000, McGraw Hill.

    Research output: Book/ReportBook

    Construction risk analysis tool for determining liquidated damages insurance premiums: Case study

    Griffis, F. H. & Christodoulou, S., Nov 1 2000, In : Journal of Construction Engineering and Management. 126, 6, p. 407-413 7 p.

    Research output: Contribution to journalArticle

    FIAPP and the three-dimensional computer model

    Griffis, F. H. & Sturts, C. S., Dec 1 2000, Proceedings of Construction Congress VI: Building Together for a Better Tomorrow in an Increasingly Complex World. p. 996-1000 5 p. (Proceedings of Construction Congress VI: Building Together for a Better Tomorrow in an Increasingly Complex World; vol. 278).

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    1999

    Preventative maintenance management system for New York City bridges: Update 1998, The Center for Infrastructure Studies

    Vaicatis, R., Betti, R., Bieniek, M., Griffis, F., Hourani, M., Iskander, M., Schwartz, S. & Testa, R., 1999, Columbia University, New York. (Report No. 98-1)

    Research output: Book/ReportOther report

    1998

    Electronic reporting and auditing systems for transmission pipeline incident/accident and annual reports

    Greenfeld, J. S., Golub, E., Dresnack, R., Griffis, F. H. & Pignataro, L. J., Dec 1 1998, In : American Society of Mechanical Engineers, Pressure Vessels and Piping Division (Publication) PVP. 378, p. 87-95 9 p.

    Research output: Contribution to journalArticle

    Safe separation distances: Natural gas transmission pipeline incidents

    Golub, E., Greenfeld, J., Dresnack, R., Griffis, F. H. & Pignataro, L., Jan 1 1998, p. 37-40. 4 p.

    Research output: Contribution to conferencePaper

    Some thoughts on construction education

    Griffis, F., 1998, Education in Construction Management, Proceedings of the Second A.J. Etkin International Seminar, Haifa, Israel, May 1998.

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    The causes of hazardous liquid transmission pipeline accidents; what can be determined from US DOT databases?

    Greenfeld, J. S., Golub, E., Dresnack, R., Griffis, F. H. & Pignataro, L. J., Dec 1 1998, In : American Society of Mechanical Engineers, Pressure Vessels and Piping Division (Publication) PVP. 378, p. 105-112 8 p.

    Research output: Contribution to journalArticle

    1997

    A few good men and women too

    Griffis, F., Shoff, J. R. & Zoltanetsky, P., 1997, Proceedings of the American Concrete Institute, April 1997.

    Research output: Chapter in Book/Report/Conference proceedingConference contribution