No photo of Fletcher Griffis

Fletcher Griffis

Full Professor

    1966 …2017

    Research output per year

    If you made any changes in Pure these will be visible here soon.

    Research Output

    Article

    Addressing pricing: Value bidding for engineers and consultants

    Sturts, C. S. & Griffis, F. H., Jun 2005, In : Journal of Construction Engineering and Management. 131, 6, p. 621-630 10 p.

    Research output: Contribution to journalArticle

    ADR, TQM, partnering, and other management fantasies

    Griffis, F. H., 1992, In : Journal of Professional Issues in Engineering Education and Practice. 118, 4, p. 331-344 14 p.

    Research output: Contribution to journalArticle

    A framework for an automated and integrated project scheduling and management system

    Chen, S. M., Griffis, F. H., Chen, P. H. & Chang, L. M., 2013, In : Automation in Construction. 35, p. 89-110 22 p.

    Research output: Contribution to journalArticle

    Bidding strategy: Winning overkey competitors

    Griffis, F. H., 1992, In : Journal of Construction Engineering and Management. 118, 1, p. 151-165 15 p.

    Research output: Contribution to journalArticle

    Case for cost-plus contracting

    Griffis, F. H. & Butler, M., Mar 1988, In : Journal of Construction Engineering and Management. 114, 1, p. 83-94 12 p.

    Research output: Contribution to journalArticle

    Construction risk analysis tool for determining liquidated damages insurance premiums: Case study

    Griffis, F. H. & Christodoulou, S., Nov 2000, In : Journal of Construction Engineering and Management. 126, 6, p. 407-413 7 p.

    Research output: Contribution to journalArticle

    Design of public projects: Outsource or in-house?

    Griffis, F. H. & Choi, H., Jan 1 2013, In : Journal of Management in Engineering. 29, 1, p. 2-9 8 p.

    Research output: Contribution to journalArticle

    Dredging and the environment.

    Meccia, R. M., Griffis, F. H. & Army, U. S., 1975, In : [No source information available].

    Research output: Contribution to journalArticle

    Electronic reporting and auditing systems for transmission pipeline incident/accident and annual reports

    Greenfeld, J. S., Golub, E., Dresnack, R., Griffis, F. H. & Pignataro, L. J., 1998, In : American Society of Mechanical Engineers, Pressure Vessels and Piping Division (Publication) PVP. 378, p. 87-95 9 p.

    Research output: Contribution to journalArticle

    Engineering failures exposed by Hurricane Katrina

    Griffis, F. H. B., Apr 2007, In : Technology in Society. 29, 2, p. 189-195 7 p.

    Research output: Contribution to journalArticle

    Integration of engineering, design, and construction

    Reinschmidt, K. F., (Bud) Griffis, F. H. & Bronner, P. L., Dec 1991, In : Journal of Construction Engineering and Management. 117, 4, p. 756-772 17 p.

    Research output: Contribution to journalArticle

    Meeting issues of preventive maintenance for New York city bridges

    Bieniek, M. P., Bud Griffls, F. H., Gokhale, S. & Schwartz, S. I., 1990, In : Journal of Professional Issues in Engineering Education and Practice. 116, 4, p. 323-332 10 p.

    Research output: Contribution to journalArticle

    Pricing engineering services

    Sturts, C. S. & Griffis, F. H., Apr 2005, In : Journal of Management in Engineering. 21, 2, p. 56-62 7 p.

    Research output: Contribution to journalArticle

    Productividad Automatizada Basada en el Itinerario Animado (APBSA): Una Simulacion Basada en un Enfoque del Analisis de Compensacion Tiempo-Costo

    Translated title of the contribution: Automated productivity-based schedule animation: Simulation-based approach to time-cost trade-off analysisGelisen, G. & Griffis, F. H., Apr 1 2014, In : Journal of Construction Engineering and Management. 140, 4, B4013007.

    Research output: Contribution to journalArticle

    Project specific, driven based contingency estimating model in construction

    Liu, M., Griffis, F. & Bates, A., 2012, In : Journal of Management in Engineering.

    Research output: Contribution to journalArticle

    Reengineering infrastructure research

    Bud Griffis, F. H., Jan 1995, In : Journal of Professional Issues in Engineering Education and Practice. 121, 1, p. 11-18 8 p.

    Research output: Contribution to journalArticle

    Revamping Fort Drum

    Griffis, F., 1986, The Military Engineer.

    Research output: Contribution to specialist publicationArticle

    Simulation and analytical techniques for construction resource planning and scheduling

    Chen, S. M., Griffis, F. H., Chen, P. H. & Chang, L. M., Jan 2012, In : Automation in Construction. 21, 1, p. 99-113 15 p.

    Research output: Contribution to journalArticle

    The application of three-dimensional computer models on construction sites

    Griffis, F., Bronner, P. & O'Brien, W. J., May 1990, In : Architecture and Engineering Systems.

    Research output: Contribution to journalArticle

    The application of total quality management on JFK2000

    Griffis, F., Jan 1991, In : Transportation Research Board.

    Research output: Contribution to journalArticle

    The cable-tramway system on Hill 651

    Griffis, F., 1966, The Military Engineer.

    Research output: Contribution to specialist publicationArticle

    The causes of hazardous liquid transmission pipeline accidents; what can be determined from US DOT databases?

    Greenfeld, J. S., Golub, E., Dresnack, R., Griffis, F. H. & Pignataro, L. J., 1998, In : American Society of Mechanical Engineers, Pressure Vessels and Piping Division (Publication) PVP. 378, p. 105-112 8 p.

    Research output: Contribution to journalArticle

    Time-cost trade-off at Hanscom AFB

    Griffis, F., 1986, The Military Engineer.

    Research output: Contribution to specialist publicationArticle

    Book

    Construction planning for engineers

    Griffis, F. & Farr, J., 2000, McGraw Hill.

    Research output: Book/ReportBook

    Chapter

    Airport upgrading versus landing gear optimization

    Griffis, F. & Gammon, M. A., May 1976, ASCE Transp Eng J. 2 ed. Vol. 102. p. 313-329 17 p.

    Research output: Chapter in Book/Report/Conference proceedingChapter

    Corps of engineers dredged material research program

    Montgomery, R. L. & Griffis, F., 1974, Unknown Host Publication Title. WODCON Assoc, p. 121-158 38 p.

    Research output: Chapter in Book/Report/Conference proceedingChapter

    Effectiveness of U.S. and international pipeline regulations with regard to land use planning

    Dresnack, R., Golub, E., Greenfeld, J., Griffis, F. H. & Pignataro, L. J., 1996, Proceedings of the International Pipeline Conference, IPC. Vol. 1. p. 25-30 6 p.

    Research output: Chapter in Book/Report/Conference proceedingChapter

    Open Access

    Engineering challenges of dredged material disposal

    Meccia, R. M., Allanach, W. C. & Griffis, F. H., 1975, J. WATERW. HARBOURS AND COAST. ENGNG. DIV. - PROC. A.S.C.E.. 1 WWI ed. Vol. 101. p. 1-13 13 p.

    Research output: Chapter in Book/Report/Conference proceedingChapter

    Chapter (peer-reviewed)

    Contractor’s organization

    Griffis, F., 1996, Standard handbook of heavy construction. O'Brien, J. J. (ed.). 3rd ed. McGraw Hill, Chapter 1

    Research output: Chapter in Book/Report/Conference proceedingChapter (peer-reviewed)

    Fully integrated and automated project process (FIAPP) for the project manager and executive

    Griffis, F. & Sturts, C., 2003, 4D CAD and visualization in construction: Developments and applications. Exton, PA: A.A. Balkema Publishers, Chapter 3

    Research output: Chapter in Book/Report/Conference proceedingChapter (peer-reviewed)

    Conference contribution

    Adaptation of the LIRR system to Maglev for faster, more convenient and lower cost service

    Powell, J., Griffis, F., Danby, G., Fazio, E. & Jordan, J., 2009, 2nd Advanced Energy Conference, Stony Brook, Long Island, NY, Nov. 18-19, 2009.

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    A dynamic analysis of the competitive bidding problem

    Griffis, F. & Estes, C., 1974, Proceedings, National Transportation Engineering, American Society of Civil Engineers, Montreal, 1974.

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    A few good men and women too

    Griffis, F., Shoff, J. R. & Zoltanetsky, P., 1997, Proceedings of the American Concrete Institute, April 1997.

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    A project management system for complex environmental research programs

    Griffis, F., 1974, Fourth International Congress, INTERNET.

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    Automated Productivity Based Schedule Automation (APBSA) case study: Systems Engineering Facility III, Hanscom AFB, MA

    Griffis, F. & Gelisen, G., 2010, 2010 ASCE Construction Congress, Banff, Canada, May 2010.

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    Building information model: The role and need of the constructors

    Aslani, P., Griffis, F. H. & Chiarelli, L., 2009, Building a Sustainable Future - Proceedings of the 2009 Construction Research Congress. p. 467-476 10 p. (Building a Sustainable Future - Proceedings of the 2009 Construction Research Congress).

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    Building information model in the management of construction

    Griffis, F., 2007, American Society of Civil Engineers, Met Section Structures Group, December 2007.

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    Connecting technology, industry and research: A vertical integrated project course for BIM education

    Liu, M., Griffis, F. & Bates, A., 2013, Fifth International Conference on Construction Engineering and Project Management (ICCEPM-2013).

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    Construction challenges associated with Maglev guideways

    Griffis, F., 2007, Proceedings, ASCE Construction Congress, May 2007.

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    Construction challenges associated with Maglev research

    Griffis, F., 2007, Proceedings of the Annual Construction Congress, American Society of Civil Engineers.

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    Critical need of New York City infrastructure

    Griffis, F., 2008, National Infrastructure Conference, Iona College, February 19, 2008.

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    Design of urban construction processes

    Griffis, F., 1993, Proceedings, 1993 Joint Triennial Conference of the American Society of Civil Engineers and the Institution of Civil Engineers, London, September 26, 1993.

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    Evaluation of New York State's County Plans for Disaster Resiliency

    Azimi, E., Gholitabar, S. & Griffis, F. H., 2016, Construction Research Congress 2016: Old and New Construction Technologies Converge in Historic San Juan - Proceedings of the 2016 Construction Research Congress, CRC 2016. Perdomo-Rivera, J. L., Lopez del Puerto, C., Gonzalez-Quevedo, A., Maldonado-Fortunet, F. & Molina-Bas, O. I. (eds.). American Society of Civil Engineers (ASCE), p. 1528-1537 10 p. (Construction Research Congress 2016: Old and New Construction Technologies Converge in Historic San Juan - Proceedings of the 2016 Construction Research Congress, CRC 2016).

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    FIAPP and the three-dimensional computer model

    Griffis, F. H. & Sturts, C. S., 2000, Proceedings of Construction Congress VI: Building Together for a Better Tomorrow in an Increasingly Complex World. p. 996-1000 5 p. (Proceedings of Construction Congress VI: Building Together for a Better Tomorrow in an Increasingly Complex World; vol. 278).

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    Four-dimensional computer models and simulation for the support of the Fully Integrated and Automated Project Process (FIAPP)

    Shih-Ming, C., Christodoulou, S. & Griffis, F., 2001, Specialty Conference on Fully Integrated and Automated Project Processes, VPI, September 2001.

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    Fully integrated and automated project processes (FIAPP) in building construction and renovation - A brick at a time

    Subsomboon, K., Christodoulou, S. & Griffis, F. H., 2003, Building Integration Solutions: Proceedings of the Architectural Engineering 2003 Conference. Lui, M., Lui, M. & Parfitt, K. M. (eds.). p. 204-208 5 p. (Architectural Engineering, Building Integration Solutions).

    Research output: Chapter in Book/Report/Conference proceedingConference contribution

    Future developments in New York infrastructure

    Griffis, F., 2008, Proceedings, Annual Infrastructure Conference, ASCE, March 31, 2008.

    Research output: Chapter in Book/Report/Conference proceedingConference contribution