    Research Output

    Filter
    Article
    2014

    Productividad Automatizada Basada en el Itinerario Animado (APBSA): Una Simulacion Basada en un Enfoque del Analisis de Compensacion Tiempo-Costo

    Translated title of the contribution: Automated productivity-based schedule animation: Simulation-based approach to time-cost trade-off analysisGelisen, G. & Griffis, F. H., Apr 1 2014, In : Journal of Construction Engineering and Management. 140, 4, B4013007.

    Research output: Contribution to journalArticle

    2013

    A framework for an automated and integrated project scheduling and management system

    Chen, S. M., Griffis, F. H., Chen, P. H. & Chang, L. M., May 8 2013, In : Automation in Construction. 35, p. 89-110 22 p.

    Research output: Contribution to journalArticle

    Design of public projects: Outsource or in-house?

    Griffis, F. H. & Choi, H., Jan 1 2013, In : Journal of Management in Engineering. 29, 1, p. 2-9 8 p.

    Research output: Contribution to journalArticle

    2012

    Project specific, driven based contingency estimating model in construction

    Liu, M., Griffis, F. & Bates, A., 2012, In : Journal of Management in Engineering.

    Research output: Contribution to journalArticle

    Simulation and analytical techniques for construction resource planning and scheduling

    Chen, S. M., Griffis, F. H., Chen, P. H. & Chang, L. M., Jan 1 2012, In : Automation in Construction. 21, 1, p. 99-113 15 p.

    Research output: Contribution to journalArticle

    2007

    Engineering failures exposed by Hurricane Katrina

    Griffis, F. H. B., Apr 1 2007, In : Technology in Society. 29, 2, p. 189-195 7 p.

    Research output: Contribution to journalArticle

    2005

    Addressing pricing: Value bidding for engineers and consultants

    Sturts, C. S. & Griffis, F. H., Jun 1 2005, In : Journal of Construction Engineering and Management. 131, 6, p. 621-630 10 p.

    Research output: Contribution to journalArticle

    Pricing engineering services

    Sturts, C. S. & Griffis, F. H., Apr 1 2005, In : Journal of Management in Engineering. 21, 2, p. 56-62 7 p.

    Research output: Contribution to journalArticle

    2000

    Construction risk analysis tool for determining liquidated damages insurance premiums: Case study

    Griffis, F. H. & Christodoulou, S., Nov 1 2000, In : Journal of Construction Engineering and Management. 126, 6, p. 407-413 7 p.

    Research output: Contribution to journalArticle

    1998

    Electronic reporting and auditing systems for transmission pipeline incident/accident and annual reports

    Greenfeld, J. S., Golub, E., Dresnack, R., Griffis, F. H. & Pignataro, L. J., Dec 1 1998, In : American Society of Mechanical Engineers, Pressure Vessels and Piping Division (Publication) PVP. 378, p. 87-95 9 p.

    Research output: Contribution to journalArticle

    The causes of hazardous liquid transmission pipeline accidents; what can be determined from US DOT databases?

    Greenfeld, J. S., Golub, E., Dresnack, R., Griffis, F. H. & Pignataro, L. J., Dec 1 1998, In : American Society of Mechanical Engineers, Pressure Vessels and Piping Division (Publication) PVP. 378, p. 105-112 8 p.

    Research output: Contribution to journalArticle

    1997
    1995

    Reengineering infrastructure research

    Bud Griffis, F. H., Jan 1995, In : Journal of Professional Issues in Engineering Education and Practice. 121, 1, p. 11-18 8 p.

    Research output: Contribution to journalArticle

    1992

    ADR, TQM, partnering, and other management fantasies

    Griffis, F. H., Jan 1 1992, In : Journal of Professional Issues in Engineering Education and Practice. 118, 4, p. 331-344 14 p.

    Research output: Contribution to journalArticle

    Bidding strategy: Winning overkey competitors

    Griffis, F. H., Jan 1 1992, In : Journal of Construction Engineering and Management. 118, 1, p. 151-165 15 p.

    Research output: Contribution to journalArticle

    1991

    Integration of engineering, design, and construction

    Reinschmidt, K. F., (Bud) Griffis, F. H. & Bronner, P. L., Dec 1991, In : Journal of Construction Engineering and Management. 117, 4, p. 756-772 17 p.

    Research output: Contribution to journalArticle

    The application of total quality management on JFK2000

    Griffis, F., Jan 1991, In : Transportation Research Board.

    Research output: Contribution to journalArticle

    1990

    Meeting issues of preventive maintenance for New York city bridges

    Bieniek, M. P., Bud Griffls, F. H., Gokhale, S. & Schwartz, S. I., Jan 1 1990, In : Journal of Professional Issues in Engineering Education and Practice. 116, 4, p. 323-332 10 p.

    Research output: Contribution to journalArticle

    The application of three-dimensional computer models on construction sites

    Griffis, F., Bronner, P. & O'Brien, W. J., May 1990, In : Architecture and Engineering Systems.

    Research output: Contribution to journalArticle

    1988

    Case for cost-plus contracting

    Griffis, F. H. & Butler, M., Mar 1988, In : Journal of Construction Engineering and Management. 114, 1, p. 83-94 12 p.

    Research output: Contribution to journalArticle

    1986

    Revamping Fort Drum

    Griffis, F., 1986, The Military Engineer.

    Research output: Contribution to specialist publicationArticle

    Time-cost trade-off at Hanscom AFB

    Griffis, F., 1986, The Military Engineer.

    Research output: Contribution to specialist publicationArticle

    1975

    Dredging and the environment.

    Meccia, R. M., Griffis, F. H. & Army, U. S., Jan 1 1975, In : [No source information available].

    Research output: Contribution to journalArticle

    1966

    The cable-tramway system on Hill 651

    Griffis, F., 1966, The Military Engineer.

    Research output: Contribution to specialist publicationArticle