No photo of Semiha Ergan

Semiha Ergan

Assistant Professor

    20022020

    Research output per year

    If you made any changes in Pure these will be visible here soon.

    Research Output

    Filter
    Article
    2020

    Owner requirements in as-built BIM deliverables and a system architecture for FM-specific BIM representation

    Dias, P. D. R. & Ergan, S., Jan 1 2020, In : Canadian Journal of Civil Engineering. 47, 2, p. 215-227 13 p.

    Research output: Contribution to journalArticle

    Towards optimal control of air handling units using deep reinforcement learning and recurrent neural network

    Zou, Z., Yu, X. & Ergan, S., Jan 15 2020, In : Building and Environment. 168, 106535.

    Research output: Contribution to journalArticle

    2019

    A data-driven approach to extract operational signatures of HVAC systems and analyze impact on electricity consumption

    Yu, X., Ergan, S. & Dedemen, G., Nov 1 2019, In : Applied Energy. 253, 113497.

    Research output: Contribution to journalArticle

    Quantifying Human Experience in Architectural Spaces with Integrated Virtual Reality and Body Sensor Networks

    Ergan, S., Radwan, A., Zou, Z., Tseng, H. A. & Han, X., Mar 1 2019, In : Journal of Computing in Civil Engineering. 33, 2, 04018062.

    Research output: Contribution to journalArticle

    2018
    Open Access
    2017

    BIM for FM: Information Requirements to Support HVAC-Related Corrective Maintenance

    Yang, X. & Ergan, S., Dec 1 2017, In : Journal of Architectural Engineering. 23, 4, 4017023.

    Research output: Contribution to journalArticle

    Modeling information flow in the supply chain of structural steel components

    Akcay, E. C., Ergan, S. & Arditi, D., Aug 18 2017, In : Journal of Civil Engineering and Management. 23, 6, p. 753-764 12 p.

    Research output: Contribution to journalArticle

    2016

    Evaluation of Different Features for Matching Point Clouds to Building Information Models

    Gao, T., Ergan, S., Akinci, B. & Garrett, J., Jan 1 2016, In : Journal of Computing in Civil Engineering. 30, 1, 04014107.

    Research output: Contribution to journalArticle

    2015

    An approach to combine progressively captured point clouds for BIM update

    Gao, T., Akinci, B., Ergan, S. & Garrett, J., Oct 2015, In : Advanced Engineering Informatics. 29, 4, p. 1001-1012 12 p.

    Research output: Contribution to journalArticle

    Requirements of integrated design teams while evaluating advanced energy retrofit design options in immersive virtual environments

    Yang, X., Ergan, S. & Knox, K., Jan 1 2015, In : Buildings. 5, 4, p. 1302-1320 19 p.

    Research output: Contribution to journalArticle

    Visualization requirements of engineers for risk assessment of embankment dams

    Kasireddy, V., Ergan, S., Akinci, B. & Gulgec, N. S., Dec 1 2015, In : Visualization in Engineering. 3, 1, 1.

    Research output: Contribution to journalArticle

    Visualization requirements of engineers for risk assessment of embankment dams

    Kasireddy, V., Ergan, S., Akinci, B. & Gulgec, N., Jan 16 2015, In : Visualization in Engineering. 3, 1

    Research output: Contribution to journalArticle

    2014

    Evaluation of visualization techniques for use by facility operators during monitoring tasks

    Yang, X. & Ergan, S., Aug 2014, In : Automation in Construction. 44, p. 103-118 16 p.

    Research output: Contribution to journalArticle

    2012
    2011

    Analysis of modeling effort and impact of different levels of detail in building information models

    Leite, F., Akcamete, A., Akinci, B., Atasoy, G. & Kiziltas, S., Aug 1 2011, In : Automation in Construction. 20, 5, p. 601-609 9 p.

    Research output: Contribution to journalArticle

    2010

    Comparison of experienced and novice cost estimator behaviors in information pull and push methods

    Kiziltas, S., Akinci, B. & Gonzalez, C., Feb 1 2010, In : Canadian Journal of Civil Engineering. 37, 2, p. 290-301 12 p.

    Research output: Contribution to journalArticle

    2009

    Contextual information requirements of cost estimators from past construction projects

    Kiziltas, S. & Akinci, B., Aug 28 2009, In : Journal of Construction Engineering and Management. 135, 9, p. 841-852 12 p.

    Research output: Contribution to journalArticle

    2008
    2006

    Modeling and analyzing the impact of technology on data capture and transfer processes at construction sites: A case study

    Akinci, B., Kiziltas, S., Ergen, E., Karaesmen, I. Z. & Keceli, F., Oct 24 2006, In : Journal of Construction Engineering and Management. 132, 11, p. 1148-1157 10 p., 010611QCO.

    Research output: Contribution to journalArticle

    2005

    Strategic use of quality function deployment (QFD) in the construction industry

    Dikmen, I., Talat Birgonul, M. & Kiziltas, S., Feb 2005, In : Building and Environment. 40, 2, p. 245-255 11 p.

    Research output: Contribution to journalArticle