Abstract
Particular attention is given to the concept of relating the level of investment that is required if the objectives of a demonstration project are to have at least a 0. 5 probability of being detected. The results of a case study in a large urban area are discussed in detail.
Original language | English (US) |
---|---|
Title of host publication | Highw Res Rec |
Pages | 1-15 |
Number of pages | 15 |
Volume | 473 |
State | Published - 1973 |
ASJC Scopus subject areas
- General Engineering