T1 - Implementation of Scrum in the Construction Industry
AU - Streule, Thomas
AU - Miserini, Nino
AU - Bartlomé, Olin
AU - Klippel, Michael
AU - García de Soto, Borja
N1 - Publisher Copyright:
© 2016 The Authors. Published by Elsevier Ltd.
PY - 2016
Y1 - 2016
N2 - The way in which construction projects are managed has not changed significantly in the last decades; however, stakeholders, materials, competition, and user requirements are continuously changing. This creates a gap between the current managerial view on how construction projects are conducted and how they could be managed to increase efficiency. The construction industry could use new frameworks for action in the project and product management, and learn from the experiences of other industries. With this background in mind, some construction companies are enhancing the performance of their project teams to improve their competitiveness and increase the added value to their clients and themselves. This paper investigates the implementation of a framework from the IT sector into the construction industry: Scrum. Conducting a case study, the implementation and application of Scrum was analysed through the evaluation of its different artifacts. This research covers the following questions: Can Scrum be implemented in the design phase of the construction industry? What adaptations are needed to use Scrum to improve the design phase of construction projects? How and where could Scrum, or parts of it, be used by the design and planning departments of construction companies? The results from this study show that Scrum has great potential in the design and planning departments of construction firms. From the analysis of the applications of Scrum in the case study, tangible benefits and weaknesses of the implementation, and its different artifacts, were identified. Finally, this paper gives recommendations about the use of Scrum in the design phase and proposes an outlook to implement Scrum in other phases of construction projects.
AB - The way in which construction projects are managed has not changed significantly in the last decades; however, stakeholders, materials, competition, and user requirements are continuously changing. This creates a gap between the current managerial view on how construction projects are conducted and how they could be managed to increase efficiency. The construction industry could use new frameworks for action in the project and product management, and learn from the experiences of other industries. With this background in mind, some construction companies are enhancing the performance of their project teams to improve their competitiveness and increase the added value to their clients and themselves. This paper investigates the implementation of a framework from the IT sector into the construction industry: Scrum. Conducting a case study, the implementation and application of Scrum was analysed through the evaluation of its different artifacts. This research covers the following questions: Can Scrum be implemented in the design phase of the construction industry? What adaptations are needed to use Scrum to improve the design phase of construction projects? How and where could Scrum, or parts of it, be used by the design and planning departments of construction companies? The results from this study show that Scrum has great potential in the design and planning departments of construction firms. From the analysis of the applications of Scrum in the case study, tangible benefits and weaknesses of the implementation, and its different artifacts, were identified. Finally, this paper gives recommendations about the use of Scrum in the design phase and proposes an outlook to implement Scrum in other phases of construction projects.
KW - Agile
KW - Design Phase
KW - Process Model
KW - Project Management
KW - Scrum
UR - http://www.scopus.com/inward/record.url?scp=85007014334&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=85007014334&partnerID=8YFLogxK
U2 - 10.1016/j.proeng.2016.11.619
DO - 10.1016/j.proeng.2016.11.619
M3 - Conference article
AN - SCOPUS:85007014334
SN - 1877-7058
VL - 164
SP - 269
EP - 276
JO - Procedia Engineering
JF - Procedia Engineering
T2 - 5th Creative Construction Conference, CCC 2016
Y2 - 25 June 2016 through 28 June 2016
ER -