Abstract
The purpose of this paper is to integrate a quality control (inspection) procedure into a job shop manufacturing process described by an M/M/1 queue. Given a joint inspection and queueing system, an optimization problem for minimizing inspection and queueing related costs is formulated and resolved.
Original language | English (US) |
---|---|
Pages (from-to) | 447-455 |
Number of pages | 9 |
Journal | International Journal of Production Research |
Volume | 25 |
Issue number | 3 |
DOIs | |
State | Published - Mar 1987 |
ASJC Scopus subject areas
- Strategy and Management
- Management Science and Operations Research
- Industrial and Manufacturing Engineering