The DZERO level 3 DAQ system: Operation and upgrades

Aran Garcia-Bellido, Tulika Boset, Gustaaf Brooijmans, Doug Chapin, David Cuttst, Stuart Fuess, Thomas Gadfort, Andrew Haas, William Lee, Ron Rechenmacher, Scott Snyder, Gordon Watts, Yunhe Xie

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Abstract

The DØ Level 3 data acquisition system for Run II of the Tevatron has been reliably operating since May 2002. Designed to handle average event sizes of 250 kilobytes at a rate of 1 kHz, the system has been upgraded to be able to process more events, doubling its typical output rate from 50 Hz to 100 Hz, while coping with higher event sizes at the beginning of high luminosity collider stores. The system routes and transfers event fragments from 63 VME crates to any of approximately 320 processing nodes. The addition of more farm nodes, the performance of the components, and the running experience are described here.

Original languageEnglish (US)
Title of host publication2007 15th IEEE-NPSS Real-Time Conference, RT
DOIs
StatePublished - 2007
Externally publishedYes
Event2007 15th IEEE-NPSS Real-Time Conference, RT - Batavia, IL, United States
Duration: Apr 29 2007May 4 2007

Publication series

Name2007 15th IEEE-NPSS Real-Time Conference, RT

Other

Other2007 15th IEEE-NPSS Real-Time Conference, RT
CountryUnited States
CityBatavia, IL
Period4/29/075/4/07

ASJC Scopus subject areas

  • Hardware and Architecture
  • Control and Systems Engineering

Fingerprint Dive into the research topics of 'The DZERO level 3 DAQ system: Operation and upgrades'. Together they form a unique fingerprint.

Cite this