TY - JOUR
T1 - Upgrading slum infrastructure - divergent objectives in search of a consensus ( housing).
AU - Angel, S.
PY - 1983
Y1 - 1983
N2 - Provides the basis for a more systematic study of the objectives, interests, preferences, and motives of the main participants in the provision of infrastructure services in slum areas. Identifies six groups, the views of which have to be reconciled: the 'housers', the municipal engineers, the 'community builders', the politicians, the international funders, and the slum dwellers themselves. -D.Hilling
AB - Provides the basis for a more systematic study of the objectives, interests, preferences, and motives of the main participants in the provision of infrastructure services in slum areas. Identifies six groups, the views of which have to be reconciled: the 'housers', the municipal engineers, the 'community builders', the politicians, the international funders, and the slum dwellers themselves. -D.Hilling
UR - http://www.scopus.com/inward/record.url?scp=0021075538&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=0021075538&partnerID=8YFLogxK
U2 - 10.3828/twpr.5.1.02064j2185j13770
DO - 10.3828/twpr.5.1.02064j2185j13770
M3 - Article
AN - SCOPUS:0021075538
SN - 0142-7849
VL - 5
SP - 5
EP - 22
JO - Third World Planning Review
JF - Third World Planning Review
IS - 1
ER -